MOORE POWERELECTRICAL

Petaluma / Services / Electrical Panel Upgrade

Electrical Panel Upgrade · Petaluma, CA

Electrical panel upgrade in Petaluma, CA

Need an electrical panel upgrade in Petaluma? Call (815) 456-4349. We connect you with an independent, CSLB-licensed electrician who sizes the new panel with a load calculation and handles the City permit and PG&E scheduling.

  • California
    licensed pros
  • Permits pulled
    when required
  • Written estimate
    before work
  • Petaluma
    and nearby
Panel upgradeMore capacity and breaker space

What it is

What a panel upgrade means

An electrical panel upgrade replaces the main breaker panel, and often the service, to give a home more capacity and more breaker spaces. A load calculation shows the size the home needs.

  • Panel replacement on the same service size
  • Service upgrade to a larger amperage
  • New breakers, including AFCI and GFCI types
  • Labeling of every circuit

Why Petaluma homes upgrade

  • Adding an EV charger
  • Switching to a heat pump or induction range
  • Adding solar or battery storage
  • Replacing a Federal Pacific or full panel

Permits

Panel upgrade permits in Petaluma

The City of Petaluma requires a permit for an electric panel service upgrade. The Building Division issues these over the counter, without plan review, usually the same day or within a few days.

The permit counter is at City Hall West Wing, 11 English Street. Permit technicians answer at 707-778-4301, and inspections are requested at 707-778-4479.

Work follows the 2025 California Electrical Code, in effect since January 1, 2026 and based on the 2023 National Electrical Code.

Before you call

  • Main breaker size from the panel label
  • Panel brand
  • The new loads you plan
  • Photos of the panel and meter

Upgrade day

What happens on upgrade day

  1. PG&E disconnects the service if the meter or service changes.
  2. The electrician removes the old panel and installs the new one.
  3. Circuits are moved over, tested and labeled.
  4. The City inspector checks the work and PG&E reconnects.

If your current panel is an FPE model, see Federal Pacific panel replacement. Planning for outages too? See generator installation.

Ask the electrician

  • Does the meter or service need to change?
  • Will the new panel be generator ready?
  • How long will the power be off?

From call to final inspection

How a typical Petaluma job works

  1. You call

    Tell us what is happening, your ZIP and how urgent it is. Have a photo of the panel label ready if you can.

  2. We connect you

    We match you with an independent, licensed electrician who handles that kind of work near you.

  3. Estimate and permit

    The electrician confirms the scope in writing and pulls a permit when the job needs one.

  4. Work and inspection

    The work is done, the local inspector signs off when required, and the utility reconnects service if it was disconnected.

Need electrical panel upgrade in Petaluma? Have your ZIP and a short description ready.

Call (815) 456-4349

Questions we hear

Electrical Panel Upgrade in Petaluma: FAQs

Talk to a licensed electrician

Describe the problem and your ZIP. We will connect you with a local pro in Petaluma.

Call (815) 456-4349
How do I know if I need a panel upgrade?

Common signs are no free breaker spaces, a main breaker that trips, a Federal Pacific panel, or plans for an EV charger, heat pump or solar. A load calculation gives the real answer.

How fast can I get a panel upgrade permit in Petaluma?

The City usually issues panel service upgrade permits over the counter, the same day or within a few days.

Will my power be off during a panel upgrade?

Yes, usually for part of a day. If PG&E must disconnect the service, the electrician coordinates that appointment.

Does a panel upgrade help with an EV charger?

Often, but not always. Some homes can add a charger with a load management device instead. The load calculation shows which option fits.

Page updated 2026-10-25.

Call (815) 456-4349